Stock material conservation is a decisive factor in press working. All possible means should be tired to attain this without sacrificing the accuracy requirement of the piece part.
Economy of any strip layout in percentage is found out by the following formula
Economy factor (E) in % = (Area of the blank x number of rows x 100)/ (width of the strip x Pitch)
